Main Panel after Analysis
Once the input data have been verified, select Analyze to carry out the EGL analysis. A third section, Results, now appears in the panel. Once an analysis has been carried out, the project is locked and data cannot be changed until the project is unlocked.
Depth@Site is the maximum water depth at the site. Velocity@Site is the maximum water velocity at the site. If the site does not correspond to a transect point, linear interpolation is used to determine Depth@Site and Velocity@Site between the two adjacent transect points.
Results can also be plotted.